GE DS215UDSAG1AZZ01A
The GE DS215UDSAG1AZZ01A EX2000 Firmware Board is a crucial component of the GE DS215UDSAG1AZZ01A generator set.
It houses the firmware, which is the software that controls the generator’s operations. The firmware board plays a vital role in ensuring the generator’s efficient and reliable performance.
Key functions of the firmware board:
1. Controls generator startup and shutdown: The firmware board initiates the startup sequence and manages the shutdown process, ensuring safe and controlled operation.
2. Monitors and regulates generator performance: It continuously monitors various parameters such as voltage, current, frequency, and temperature, making necessary adjustments to maintain optimal performance.
3. Provides fault detection and protection: The firmware board is equipped with fault detection mechanisms to identify potential issues and take appropriate protective actions, preventing damage to the generator or connected equipment.
4. Enables communication with other systems: It facilitates communication with other components within the generator set, such as the control panel and monitoring systems, allowing for effective data exchange and control.
(DCS)Distributed Control System
ABB : (07KT97/98,07AC),Industrial robot parts of DSQC series,DCS(AI810, DI810 PM645)
Foxboro : FBM214,FBM242,B0123HE
Triconex : 3625,3700A,3604E
Ovation : 5X00481G01,5X00419G02,5X00605G01
Woodword : 5462-758B,SST-PB3-PCU-2 SA1509-24
HIMA : F2-DO-16-02,F8650E F7131,Z7127 F3236
Yokogawa : SAI143-S03,S1 F9342L-02,AAR181-S00 S2
Honeywell : 51402497-200,51403519-160,51199194-100,CC-PDO801
Emerson : KJ4001X1-NB1,12P3368X012,1C31147G01
(PLC)Programmable Logic Controller
GE :IS210AEPSG2B,IS220UCSAH1A,IS215ACLEH1A,IS210AEAA
Allen-Bradley:1734-IB8 1734-OB8 1769-L18ER-BB1B 1756-IM16I
ICS Triplex : T8461,T8850,T8403,T8431,T8831,T8310
Schneider Modicon : 140DDI85300,140CPS11420,140CPU67060
Prosoft : MVI46-DFNT,MVI69-DFNT,MVI56-PDPMV1
Bachmann : MPC240/270(CPU),DI232,CM202,NT255AIO288
Woodhead : 9905-068 2301A,SSTESR2CLXRLL
(TSI)
Bently : 3500/22M,13860701,3500/25,3500/32M,3500/53,3500/40
EPRO :MMS6110,MMS6120,MMS6220,MMS6312,MMS6410MMS6
ENTEK : EK C6622HS,XM124 1440-SDM02-01RA
Delivery Time
1. Express Shipping (DHL, UPS, FedEx, EMS):3-10 working days is a good rule of thumb. These services prioritize speed and often offer features like next-day or guaranteed delivery by a certain date (for an additional fee).
2. Air Mail (China Post, Hong Kong Post):7-35 working days, depending on the destination country. This is a more budget-friendly option, but it takes longer because it has lower priority for shipment.
Important Notes
Please follow the product’s instruction manual carefully for installation and debugging to avoid damage to the product.
There are no reviews yet.