GE 369-LO-0-M-F-E-0
The GE 369 Motor Management Relay is a digital motor protection system designed to protect and manage medium-sized AC motors and their driven equipment.
Key Features:
1. Motor Protection: Protects against various motor faults, including overcurrent, short circuit, phase unbalance, ground fault, and thermal overload.
2. Monitoring and Metering: Provides real-time monitoring of motor parameters such as current, voltage, power, frequency, and temperature.
3. Pre-Trip Alarms: Generates alarms to alert operators of potential problems before they escalate.
4. Event Recorder: Records critical events for analysis and troubleshooting.
5. Oscillography: Captures waveforms of motor current and voltage during faults for detailed investigation.
(DCS)Distributed Control System
ABB : (07KT97/98,07AC),Industrial robot parts of DSQC series,DCS(AI810, DI810 PM645)
Foxboro : FBM214,FBM242,B0123HE
Triconex : 3625,3700A,3604E
Ovation : 5X00481G01,5X00419G02,5X00605G01
Woodword : 5462-758B,SST-PB3-PCU-2 SA1509-24
HIMA : F2-DO-16-02,F8650E F7131,Z7127 F3236
Yokogawa : SAI143-S03,S1 F9342L-02,AAR181-S00 S2
Honeywell : 51402497-200,51403519-160,51199194-100,CC-PDO801
Emerson : KJ4001X1-NB1,12P3368X012,1C31147G01
(PLC)Programmable Logic Controller
GE :IS210AEPSG2B,IS220UCSAH1A,IS215ACLEH1A,IS210AEAA
Allen-Bradley:1734-IB8 1734-OB8 1769-L18ER-BB1B 1756-IM16I
ICS Triplex : T8461,T8850,T8403,T8431,T8831,T8310
Schneider Modicon : 140DDI85300,140CPS11420,140CPU67060
Prosoft : MVI46-DFNT,MVI69-DFNT,MVI56-PDPMV1
Bachmann : MPC240/270(CPU),DI232,CM202,NT255AIO288
Woodhead : 9905-068 2301A,SSTESR2CLXRLL
(TSI)
Bently : 3500/22M,13860701,3500/25,3500/32M,3500/53,3500/40
EPRO :MMS6110,MMS6120,MMS6220,MMS6312,MMS6410MMS6
ENTEK : EK C6622HS,XM124 1440-SDM02-01RA
Delivery Time
1. Express Shipping (DHL, UPS, FedEx, EMS):3-10 working days is a good rule of thumb. These services prioritize speed and often offer features like next-day or guaranteed delivery by a certain date (for an additional fee).
2. Air Mail (China Post, Hong Kong Post):7-35 working days, depending on the destination country. This is a more budget-friendly option, but it takes longer because it has lower priority for shipment.
Important Notes
Please follow the product’s instruction manual carefully for installation and debugging to avoid damage to the product.
There are no reviews yet.